PAD®-M Applications & Benefits
Traditionally, digesters have been designed based on detention
times between 20-30 days and with little attention given to
process considerations. With the advent of the 503 Class B
sludge regulations, the easy avenue to Class B sludge is to
hold the sludge for a minimum of 60 days at 15?C or 40 days
at 20?C. However, this results in the doubling of tank volumes
or requires that plants increase the solids content of the
feed solids.
More and more facilities are opting for the latter solution
and are installing belt thickeners or drum thickeners to increase
the solids content of the digesters to 4-6%. While this brings
the treatment plant into compliance under the new SRT requirements,
it creates a whole series of new problems if the digester is
not specifically designed to handle thickened sludge.

The PAD®-M process (Pre-thickened Aerobic Digestion with Mechanical
Thickener) is a controlled aerobic digestion system specifically
designed to handle thickened sludge and to meet the Class B
requirements for pathogens and vector attraction with a detention
time of 30 days or less. PAD®-M provides integrated operation
of a mechanical thickener and two or more aerobic digesters
to optimize performance while keeping capital costs to a minimum.
PAD®-M Advantages
- Meet 503 Class B regulations in 30 days or less
- Increase
SRT in existing basins
- Decrease required volume of new basins
- Enhance pH and temperature
control
- Improve pathogen destruction
- Increase operational flexibility
and reliability
Please see these links for
more information:
Aeration Deep Basin Solution
Las Lunas Case Study
Paris IL Case Study
Seneca Case Study
PAD®-M
Brochure
AirBeam® Brochure
Belen NM WWTP
|